Property in Barcelona and the surrounding area: project reviews, acquisition economics and delivery management.
Renovation & construction · 9/5/2026
01Where a renovation already opens up walls and floors, compliance with current acoustic standards becomes a requirement to establish in advance, rather than an optional upgrade.
Read article ↗Renovation & construction · 9/2/2026
02Finding asbestos midway through renovation means stopping work and appointing a certified contractor. A survey is best completed before the project begins.
Read article ↗Renovation & construction · 8/29/2026
03The legal right to request a lift and the physical space for a shaft in a historic stairwell are separate questions. The second often determines the outcome.
Read article ↗Renovation & construction · 8/26/2026
04Regional application rounds have limited budgets and often require the property to be the owner's main home rather than a rental investment.
Read article ↗Renovation & construction · 8/23/2026
05For electrical installations over 20 years old, the supplier requires an accredited installer's certificate before transferring the contract to the new owner.
Read article ↗Renovation & construction · 8/20/2026
06Land classification and the permitted floor-area ratio set the project's return ceiling before the first architectural sketch. They can be checked through PIC within hours.
Read article ↗Renovation & construction · 8/17/2026
07Municipal first occupation and the Generalitat cédula serve different purposes. Check the documents, competent authority and validity before buying.
Read article ↗Renovation & construction · 8/14/2026
08Occupying public space during renovation requires approval separate from the works licence. Include this process in the project programme.
Read article ↗Renovation & construction · 8/11/2026
09Structural work does not automatically make insurance compulsory. Check the LOE scope, statutory exceptions and project documents before budgeting.
Read article ↗Renovation & construction · 8/8/2026
10Reserving a third of floor area for VPO has been recognised as a planning burden rather than expropriation. It is now an established parameter rather than a challengeable risk.
Read article ↗Renovation & construction · 8/5/2026
11A technical survey and legal due diligence are parallel procedures, not substitutes. We explain the inspection's scope and why it should precede arras.
Read article ↗Renovation & construction · 7/26/2026
12Permission for premises to have commercial use and permission for a specific business are separate documents. A tenant change almost always requires the latter again.
Read article ↗Renovation & construction · 5/26/2026
13New construction and major rehabilitation follow the same licensing route in Barcelona, but their scope and risk profiles remain very different.
Read article ↗Renovation & construction · 5/23/2026
14Verifiable average processing times in days are not available for every Barcelona licence type. There is, however, a clear order of routes by speed and factors that affect them.
Read article ↗Renovation & construction · 5/14/2026
15Changing a building to hotel use is not simply permission to renovate. It is a separate procedure with its own sequence of checks. Here is the correct order.
Read article ↗Renovation & construction · 4/26/2026
16Useful reporting connects works, budget, schedule and pending decisions, with photographs alongside. Here is what each section should contain and what to agree with the contractor before work starts.
Read article ↗Renovation & construction · 4/8/2026
17Renovation is the one large flip cost that takes shape after purchase. Here's how to build the estimate before you buy, track actuals by certificate, and why no change gets carried out without written approval, with real numbers from the Compte de Urgel project.
Read article ↗Renovation & construction · 1/5/2026
18In Barcelona, a full licence (llicència) is only needed for obres majors, the largest-scale works. Lighter works go through notification, comunicat or assabentat, not a "menors licence", which does not exist.
Read article ↗Renovation & construction · 1/2/2026
19Light works in Barcelona don't need a full licence: there are three faster tracks, comunicat diferit, comunicat immediat and règim d'assabentat, each with its own pace and conditions.
Read article ↗Renovation & construction · 12/29/2025
20The cédula confirms that a home is fit to live in. Without a valid one, letting a property in Catalonia is formally impossible; selling it is possible with conditions, and getting a new cédula takes time.
Read article ↗Renovation & construction · 12/26/2025
21The certificado de eficiencia energética has to be in hand before a property is advertised for sale or rent, not sorted out at the last minute.
Read article ↗Renovation & construction · 12/23/2025
22In Barcelona, buildings more than 45 years old must undergo a technical inspection every 10 years. An overdue ITE is a common finding in historic neighbourhoods and a reason to examine the building more closely.
Read article ↗Renovation & construction · 12/20/2025
23Turning a former shop into a flat, or the other way round, takes more than an ordinary renovation: the change of use (canvi d'ús) is processed within the major works licence, and the premises must meet the standards of the new category.
Read article ↗Renovation & construction · 12/17/2025
24A municipal licence is not the only approval you need. If the works affect the façade or the common parts of the building, the owners' association has to approve them.
Read article ↗Renovation & construction · 12/14/2025
25Heritage status makes renovation harder, but it also creates a structural shortage of supply that underpins the prices of historic property.
Read article ↗Renovation & construction · 12/11/2025
26Alterations made without a permit do not go away when a flat is sold: the new owner inherits both the mismatch with the records and the duty to legalise it.
Read article ↗